1. Product Description:
Multi-Level Warehouse Steel Storage Rack Mezzanine Platform, Manual pick can reach up to 2 meters only, in order to fully utilize the head room space, shelving with raised floor is developed to improve the pick height problem. The shelving system can be built to 1+ 1, 2 tiers or above to double your warehouse capacity. The upper floor is easily reached by staircase, elevator, and slide way or loading platform.
It is good for the storage of small items with split carton picking, in some occasion the system can provide with parts container and transport containers to meet customer needs. The fast moving items can arrange to store in the ground floor while the other items can be stored in the upper floor according to priority sequence.
Multi-Level Warehouse Steel Storage Rack Mezzanine Platform, Its standard is normally the same as Long Span racking, but in most cases it is made to measure. The uniform distributed load is from 100 to 300kg per shelf, the floor loading is 500kg/m2 U.D.L. We also carry different types of floors to meet individual requirements, such as steel decking, wood decking, galvanized industrial steel decking and galvanized grating floor, the normal loading for the mezzanine is around 400-500 kg/m2
2. Steel Grating for the Mezzanine Floor:
Multi-Level Warehouse Steel Storage Rack Mezzanine Platform, This steel grating is manufactured by cross inserted steel strips with the joint spot welded. The most popular is the 30*30 spacing and 11*44 spacing. Different thickness is offered to accommodate any load rating requirements. This method offer air ventilation under Mezzanine floor and adapt to fire fighter safety regulations.
3. The basic components
Upright:
The upright is 60mm width, which has the similar structure with pallet rack frames. Horizontal and diagonal braces are fitted to the lower and upper part to ensure frame rigidity. Bolted base plates are fitted to each frame, dependent on designed capacity.
Step Beam
They are adjustable on vertical pitch of 50mm or 75mm. Each beam has a step of 24-28mm for fitting of steel shelves, and an integral safety lock is fixed to prevent accidental removal of step beams. Beam load capacity is based on your requirements.
Steel shelves
Cold rolled steel sheets are used to make the steel shelves. Normally the material thickness can be 0.6mm to 0.8mm for SPCC. Underneath the shelves, reinforced bars are spot welded to offer more loading capacity.
The finish of all painted parts is an Epoxy-powder coating polymerized at 180 °C.
The standard colors are RAL 5015 (=blue) and RAL 7035 (=light gray). Shleves can also be galvanized finishing. Special colors are available on request.
4. Factory Production:
5. RFQ documents: Before you send us your Requirement For Quotation, please prepare the following information:
- Warehouse layout CAD drawings if available.
- Mateiral flow in the warehouse.
- Loading weight per square meter for the platform.
- Clear height of the warehouse
- Required line items to be stored.
- material handling equipment informaiton such as picking trolley, mobile ladders, etc.
Packaging and Delivery:
1).Packaging details: Standard export package.
Long profiles are packed in bundles on plywood or steel pallets, and covered by plastic films. Between each package, air bags are also filled if necessary. For the thinner material such as steel decking, Edge protectors are applied. The small accessories and fasteners are packed inside of the carton boxes and fixed on pallets.
2).Delivery time: For the standard products, Our delivery time is 3 weeks after receipt of the 30% deposit. Other special application of racks can be delivered within 4-5 weeks.