. Product Description:
Manual pick can reach up to 2 meters only, in order to fully utilize the head room space, shelving with raised floor is developed to improve the pick height problem. The shelving system can be built to 1+ 1, 2 tiers or above to double your warehouse capacity. The upper floor is easily reached by staircase, elevator, and slide way or loading platform.
It is good for the storage of small items with split carton picking, in some occasion the system can provide with parts container and transport containers to meet customer needs. The fast moving items can arrange to store in the ground floor while the other items can be stored in the upper floor according to priority sequence.
Its standard is normally the same as Long Span racking, but in most cases it is made to measure. The uniform distributed load is from 100 to 300kg per shelf, the floor loading is 500kg/m2 U.D.L. We also carry different types of floors to meet individual requirements, such as steel decking, wood decking, galvanized industrial steel decking and galvanized grating floor, the normal loading for the mezzanine is around 400-500 kg/m2
2. Steel Grating for the Mezzanine Floor:
This steel grating is manufactured by cross inserted steel strips with the joint spot welded. The most popular is the 30*30 spacing and 11*44 spacing. Different thickness is offered to accommodate any load rating requirements. This method offer air ventilation under Mezzanine floor and adapt to fire fighter safety regulations.
3. The basic components
The upright is 60mm width, which has the similar structure with pallet rack frames. Horizontal and diagonal braces are fitted to the lower and upper part to ensure frame rigidity. Bolted base plates are fitted to each frame, dependent on designed capacity.
They are adjustable on vertical pitch of 50mm or 75mm. Each beam has a step of 24-28mm for fitting of steel shelves, and an integral safety lock is fixed to prevent accidental removal of step beams. Beam load capacity is based on your requirements.
Cold rolled steel sheets are used to make the steel shelves. Normally the material thickness can be 0.6mm to 0.8mm for SPCC. Underneath the shelves, reinforced bars are spot welded to offer more loading capacity.
The steel shelves can also be clipped directily to the upright without step beams. Dividers can be used for the separation of storage locations.
The finish of all painted parts is an Epoxy-powder coating polymerized at 180 °C.
The standard colors are RAL 5015 (=blue) and RAL 7035 (=light gray). Shleves can also be galvanized finishing. Special colors are available on request.
4. FACTORY INTRODUCTION:
The company's manufacturing base is located in Zhenjiang, Jiangsu Province, the plant covers an area of 18,000 square meters, more than 80 employees. The factory is equipped with a number of high-precision roll-forming production lines, automated welding, laser cutting, sheet metal processing equipment and two fully automatic electrostatic powder coating lines. Professional sales engineers are responsible for the whole process from project planning and design, proposal discussion, to product supply, engineering implementation, project management and after-sales service.
Our advantages: professional logistics planning and design, high-precision manufacturing and intimate after-sales service.
5. PACKING AND DELIVERY:
1).Packaging details: Standard export package.
Long profiles are packed in bundles on plywood or steel pallets, and covered by plastic films. Between each package, air bags are also filled if necessary. For the thinner material such as steel decking, Edge protectors are applied. The small accessories and fasteners are packed inside of the carton boxes and fixed on pallets.
2).Delivery time: For the standard products, Our delivery time is 3 weeks after receipt of the 30% deposit. Other special application of racks can be delivered within 4-5 weeks.
6. Information Required for Quoation:
Before you send us your request for quotation, please make sure the following information are collected.
Please send us the following information unless you already have the material bill of quantities with full specifications:
- Pallet size LWH, pallet entry side, Overall height of the goods with pallets.
- Loading weight per pallet for design purpose.
- Warehouse layout CAD drawings, including Clear height of the warehouse.
- Your forklift information, working aisles width, forklift max. reaching height.
- Your intra logistic flow..
CERTIFICATE