Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor

Product Details
Customization: Available
Usage: Warehouse Rack
Material: Steel
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000, ISO 14001
  • Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor
  • Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor
  • Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor
  • Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor
  • Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor
  • Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor
Find Similar Products

Basic Info.

Model NO.
MF 100
Structure
Shelf
Type
Multi-Level Racking
Mobility
Adjustable
Height
0-5m
Weight
150-500kg
Closed
Semi-closed
Development
Conventional
Serviceability
Common Use
Mezzanine Height
2.3-2.7m
Floor Panel
Steel Grating with 10*44 Grid
Floor Loading
350-500kg/M2
Transport Package
Packed in Bundles on Pallets and Wraped in Film
Specification
upright 1.5mm, shelves 0.8mm
Trademark
CALIN
Origin
Jiangsu, China
HS Code
73089000
Production Capacity
20, 000 Tons Per Year

Product Description

1. PRODUCT INTRODUCTION:

Warehouse Racking Supported heavy duty metal steel Mezzanine Floor is a structure that creates a partial intermediate floor. Steel platforms, sometimes referred to as mezzanines, help utilize overhead warehouse space and can be custom designed to fit the specific needs and capabilities of your space.
Steel platforms may be temporary or semi-permanent structures. Together with the mezzanine floor steel columns, the mezzanine floor is secure, and the storage space below is maximized.
Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor
2. PRODUCT FEATURES:
Warehouse Racking Supported heavy duty metal steel Mezzanine Floor are pre-engineered and pre-manufactured bolt together systems that install easily and efficiently into your facility footprint. Installing mezzanine steel structures in your warehouse can double the space you have by adding levels to your existing facility. They can provide more space and save time without taking up any additional room on the ground floor space. These versatile structures create new areas for manufacturing, storage, and offices without the need to lease new space or construct new buildings.
Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor
Warehouse Racking Supported heavy duty metal steel Mezzanine Floor has various forms and functions. The biggest feature of its structure is the fully assembled structure, which is flexible in design, can be designed and manufactured according to different site conditions, and is widely used in modern warehouse storage.
Steel platforms are usually composed of planks, primary and secondary beams, columns, inter-pillar supports, and ladders, railings, and so on. According to the different methods of bearing treatment, steel platforms can be divided into:
1. The platform resting directly on the tripod or cantilever leg of the workshop column. The function is usually a safe passage or a simple medium-sized operating platform.
2. One side is supported by the plant column or building wall, and the other side is a platform with independent columns.
3. A platform supported on large equipment.
4. All are independent platforms.
Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor
3. PRODUCT STRUCTURE:
Unlike conventional steel constructions, it can be easily expanded, moved or modified for future requirements. Combined with a full range of accessories, such as staircases, handrails and safety gates, it lends itself to use in almost any situation: multitier flooring systems, shelving and pallet racking systems combined with flooring, etc. Mezzanine steel platform flooring system has a wide variety of span lengths, with the loading capacity from 350 kg/m² up to 1000 kg/m².

Common floor panels are available in a variety of types, including plain, checker plate and perforated panel. The goods are delivered to the second and third floors by forklifts, lifting platforms or freight elevators, and then transported to designated locations by trolleys or hydraulic pallet trucks. Compared with reinforced concrete platforms, this type of platform has the characteristics of fast construction, moderate construction cost, easy installation and disassembly, easy use, and beautiful structure. The distance between the columns of such platforms is usually within 4-6m, the first floor is about 3m high, and the second and third floors are about 2.5m high. Floor load is usually within 1000kg per square meter. This type of platform allows the closest combination of storage and management, and can be used as a warehouse office upstairs or downstairs.
Such systems are mostly used in machinery manufacturing, automotive, electronics, light industry, machinery, medicine, e-commerce and other industries.
Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor
Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor

4. FACTORY INTRODUCTION:
The company's manufacturing base is located in Zhenjiang, Jiangsu Province, the plant covers an area of 18,000 square meters, more than 80 employees. The factory is equipped with a number of high-precision roll-forming production lines, automated welding, laser cutting, sheet metal processing equipment and two fully automatic electrostatic powder coating lines. Professional sales engineers are responsible for the whole process from project planning and design, proposal discussion, to product supply, engineering implementation, project management and after-sales service.
Our advantages: professional logistics planning and design, high-precision manufacturing and intimate after-sales service.
Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor5. PACKING AND DELIVERY:
1).Packaging details: Standard export package.
Long profiles are packed in bundles on plywood or steel pallets, and covered by plastic films. Between each package, air bags are also filled if necessary. For the thinner material such as steel decking, Edge protectors are applied. The small accessories and fasteners are packed inside of the carton boxes and fixed on pallets.
2).Delivery time: For the standard products, Our delivery time is 3 weeks after receipt of the 30% deposit. Other special application of racks can be delivered within 4-5 weeks.

Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor
6. Information Required for Quoation:
Before you send us your request for quotation, please make sure the following information are collected.

Please send us the following information unless you already have the material bill of quantities with full specifications:
  1. Pallet size LWH, pallet entry side, Overall height of the goods with pallets.
  2. Loading weight per pallet for design purpose.
  3. Warehouse layout CAD drawings, including Clear height of the warehouse.
  4. Your forklift information, working aisles width, forklift max. reaching height.
  5. Your intra logistic flow..
CERTIFICATE

Waehouse Racking Supported Heavy Duty Metal Steel Mezzanine Floor

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier